Project Moho Nord TLP
Client Heerema Marine Contractors Nederland SE
Location Congo, West Africa
Year 2014
Scope Clump weight design for TLP conductor positioning frame
Moho Nord TLP

Moho Nord TLP

Moho Nord Field is located in 750 to 1050 meters water depth, at about 30 km from the existing Moho-Bilondo Floating Production Unit (FPU), 25 km from Nkossa Field and 80 km from the Djéno Onshore Terminal in Congo. Moho Nord Field Development consists of a Tension Leg Platform (TLP) type dry tree unit on the STAD for the development of Albian reserves and a subsea development for the production of Miocene reserves.

Hydrocarbons from both production centers are sent onboard a FPU for separation and export to Djeno terminal onshore. The FPU will be located 405 m from the TLP.